Interphase Tech CONDOR 4221 User Manual Page 63

  • Download
  • Add to my manuals
  • Print
  • Page
    / 124
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 62
4221 Condor Hardware Installation Procedures
51
Step 5. Power Off System
Once the board is configured, ensure that the host system and peripherals are turned OFF.
Step 6. Cabling Procedure
The cabling procedure depends on how you wish to configure the system. Your options are summarized in Table 2-19.
Table 2-19. Ethernet Cable Options
TO IMPLEMENT CABLING OPTIONS
Ethernet Single Channel AUI/10BaseT Daughter
Card
Front Panel I/O, connect a cable to P3 (RJ45) or P4 (DB15) on
the front of the Ethernet Single Channel AUI/10BaseT
Daughter Card.
Note: Only one cable or interface type can be used at a time.
Dual 10BaseT Ethernet Daughter Card Front Panel I/O, connect cables to P3 & P4 (RJ45) on the front
of the Dual Channel 10BaseT Ethernet Daughter Card.
Dual AUI Ethernet Daughter Card Front Panel I/O, connect cables to P3 & P4 (DB15) on the front
of the Dual Channel AUI Ethernet Daughter Card.
CAUTION
System power and peripheral power must be turned
OFF before attempting to install the Condor. Failure to
do so may result in severe damage to the board and/or
system.
Page view 62
1 2 ... 58 59 60 61 62 63 64 65 66 67 68 ... 123 124

Comments to this Manuals

No comments